Inspection Services

Subsea Equipment Testing

In addition to the Inspection and Witness process where the Surveyor/Engineer would witness the Factory Acceptance Testing (FAT) at the Supplier facility, Mako will verify the test documentation is approved and inspect field equipment. For this, Mako verifies the functionality testing as listed in the FAT document (Including Hydro, Load, and Drift Testing), and all test equipment is properly calibrated. Proactive subsea equipment maintenance is a key priority in the safety of personnel.

 


 