Drilling Equipment Fat Aug 1, 2019 HPU Control Panel Skid Verifying the Welding Wire Used of the Weld Joint as per the WPS Verification of the Preheat Temperature Thickness Check of Galvanized Coating Temperature checks during FAT RPM verification during FAT hpu-control-panel-skid Noise verification during FAT Mud Equipment Electrical Load Test Mud Equipment FAT mud-pump-fat-verification HPU Control Panel Skid